You may remember that I recently posted the performance or delay figures for the current Greater Anglia region for 2014, which can be viewed here). I have more recently obtained the figures for 2011 to 2013 as well, to compare them with 2014. As with the 2014 figures, they have been sub divided into four categories, Fleet, Infrastructure, Fatalities & Trespass and Bridge Strikes.
2011:
FLEET
INFRASTRUCTURE
FATALITIES & TRESPASS
BRIDGE STRIKES
2011 AT A GLANCE
2011 IN FULL
2012
FLEET
INFRASTRUCTURE
FATALITIES & TRESPASS
BRIDGE STRIKES
2012 AT A GLANCE
2012 IN FULL
2013
FLEET
INFRASTRUCTURE
FATALITIES & TRESPASS
BRIDGE STRIKES
2013 AT A GLANCE
2013 IN FULL
All these figures have been obtained from Network Rail and their Transparency Team. Remember that Abellio Greater Anglia took over the franchise in February 2012, so all the 2011 figures, along with the January 2012 figures are for when the franchise was run by National Express East Anglia.
AGA are running the franchise until October 2016, after which the new franchisee takes over, who that'll be, I don't know at the moment, but we'll find out at some point this year.
No comments:
Post a Comment